CRAC UNITS | What are they?
A CRAC unit is a critical piece of cooling equipment, consisting of filters, fans, coils, and an external direct expansion [dx] condenser, that is connected … Read More
A CRAC unit is a critical piece of cooling equipment, consisting of filters, fans, coils, and an external direct expansion [dx] condenser, that is connected … Read More
Once the flushing and cleaning activities have been completed, including the backflushing, there will usually be a delay until the handover as other commissioning works … Read More
Made of similar metals and materials to the system components; scaling and or corrosion coupons are installed within a hydraulic system [chilled water/condenser water] to … Read More
This flushing & cleaning pre-works checklist can be used and completed throughout the project and its different stages covering: Once the pre-functional checks have been … Read More
After the system flushing steps have been completed covering the Dynamic Flush, Chemical Flush, Clean Flush, and Passivation/Inhibition, the coil flushing, previously known as ‘back … Read More
Within the pipework cleaning and flushing process, the chemical cleaning stage will be started after the dynamic flushing has been completed successfully, with the water … Read More
The dynamic flushing stage is completed to remove the majority of the debris, dirt, and particles from inside the pipework system prior to moving on … Read More
Just installing new pipework for a closed-loop hydraulic system within a facility that is used for transporting heating/cooling water will not guarantee its internal cleanliness, … Read More
A data center commissioning checklist can be used to aid the monitoring and delivery of the activities, tasks, and documentation required to complete an efficient … Read More
Data Centers are usually Commissioned using ‘Levels’ as Stages and Gates. In this Article we provide a high-level overview of each with links to additional information and resources for each…
This General Pipework checklist can be used and completed throughout the project and its different stages covering: Once the pre-functional checks have been completed, including … Read More
This ventilation ductwork checklist can be used and completed throughout the project and its different stages covering: Once the pre-functional checks have been completed, including … Read More
This fire damper checklist can be used and completed throughout the project and its different stages covering: Once the pre-functional checks have been completed, the … Read More
This water-cooled chiller checklist can be used and completed throughout the project and its different stages covering: Once the pre-functional checks have been completed, the … Read More
As we know, cooling towers and other evaporative cooling devices rely on the evaporation of water to transfer heat and generate cooling. Through the evaporative … Read More
To allow the cooling towers to operate correctly, in line with the design and efficiently, various systems will need to be connected to allow them … Read More
This fan coil unit commissioning checklist can be used and completed throughout the project and its different stages covering: Once the pre-functional checks have been … Read More
A building owner should ensure a regular daily/weekly and monthly preventative maintenance schedule is applied for their cooling towers and ancillary equipment throughout the year … Read More
There are 4 reasons to ensure your evaporative cooling tower is regularly inspected and cleaned: Please note that the following, like all information, is provided … Read More
A cooling tower sweeper system is a simple system consisting of a filter, a pump, a range of plastic pipework, and various nozzles that are … Read More