AS-BUILT DRAWINGS | What are they?
Produced in the latter stages of the project by the construction project team, as-built drawings provide the final design and installation information of a project … Read More
Produced in the latter stages of the project by the construction project team, as-built drawings provide the final design and installation information of a project … Read More
Upon completion of any new CRAC [computer room air conditioning] Unit installation or modifications to an existing unit, there will be a requirement to complete … Read More
Read in conjunction with the overall project programme, look ahead schedules are used within the latter stages of the construction and commissioning phases of a … Read More
Whether deploying a Hot Standby or Cold Standby strategy to condition a critical space, ‘Group Control’ will be used where multiple CRAH or CRAC Units … Read More
Upon completion of any new CRAH [computer room air handling] Unit installation or modifications to an existing unit, there will be a requirement to complete … Read More
Upon completion of any new Gaseous / Clean Agent System installation or modifications to an existing system, there will be a requirement to complete a … Read More
This FM 200 / Gas Suppression Pre-Functional Test Checklist can be used and completed throughout the project and its different stages covering: Once the Pre-Functional … Read More
The most common type of FM200 System seen is a total flooding, automatically operated one using zoned smoke heads, installed at a high level and … Read More
Under the Building Regulations [England], Approved Document L2A, a Building Log Book should be written and issued to the building owner/operator no later than five … Read More
When installing a fixed firefighting gas extinguishing system, under NFPA 2001 and BS EN 15004-1, there is a requirement to complete a Room Integrity/Enclosure Test. … Read More
The best definition for a Clean Agent is by NFPA 2001. It describes it as “a volatile or gaseous fire extinguishant that is electrically nonconducting … Read More
To monitor the quality of the FM-200 pipework throughout different stages and before testing and commissioning works taking place, checklists will be completed by the … Read More
Upon completion of any new FM200 pipework installation or modifications to an existing system, there will be a requirement to complete a pressure [40 psi … Read More
NFPA 2001, Standard on Clean Agent Fire Extinguishing Systems stipulates that an FM-200™ system should be maintained and inspected regularly to ensure that the system … Read More
To help manage and reduce the risk to life and property from fire damage, buildings should be fitted with automatic fire sprinkler systems. The NFPA … Read More
The FM-200™ Fire Suppression System is a registered trademark of Dupont, and also known as HFC-227ea [Heptafluoropropane], is a halocarbon clean agent, that is waterless, … Read More
The difference between a CRAC Unit System and a CRAH Unit System is how the heat is transferred and then removed/ejected from the system. A … Read More
This CRAH Unit Checklist can be used and completed throughout the project and its different stages covering: Once the pre-functional checks have been completed, including … Read More
A CRAH unit is a critical piece of close control cooling equipment, consisting of filters, fans, coils, that is connected to chilled water/cooling water pipework … Read More
This CRAC Unit Checklist can be used and completed throughout the project and its different stages covering: Once the pre-functional checks have been completed, including … Read More