Skip to content
constructandcommission.com
    constructandcommission.com
    • DOC SHOP
      • Bundles [SAVINGS]
      • Cx Process [ALL]
      • Checklists [ALL]
      • Data Center [ALL]
      • Testing Procedures [ALL]
      • Fire [ALL]
      • Mechanical [ALL]
      • Maintenance [ALL]
    • CX PROCESS
      • COMMISSIONING PLAN
      • Cx Kick Off Meeting
      • Basis of Design
      • Overview of the Cx Process
      • Stage 1: Pre-Design
      • Stage 2: Design
      • Stage 3a: Pre-Construction explained
      • Stage 3b: Construction
      • Stage 3c: Commissioning
      • Stage 4: Occupancy and Operations
      • Stage 5: Continuous Commissioning
    • FIRE
      • Sprinkler Systems
      • Suppression Systems
      • FM-200
    • MECHANICAL
      • Chilled Water
      • Condenser Water
      • Heating Water
      • Ventilation
    • OTHER
      • PRE-FUNCTIONAL CHECK LISTS
      • DATA CENTER
      • LEED
      • ELECTRICAL
      • PLUMBING & DRAINAGE
      • HANDOVER
      • MAINTENANCE
    • Glossary
    constructandcommission.com
    • DOC SHOP
      • Bundles [SAVINGS]
      • Cx Process [ALL]
      • Checklists [ALL]
      • Data Center [ALL]
      • Testing Procedures [ALL]
      • Fire [ALL]
      • Mechanical [ALL]
      • Maintenance [ALL]
    • CX PROCESS
      • COMMISSIONING PLAN
      • Cx Kick Off Meeting
      • Basis of Design
      • Overview of the Cx Process
      • Stage 1: Pre-Design
      • Stage 2: Design
      • Stage 3a: Pre-Construction explained
      • Stage 3b: Construction
      • Stage 3c: Commissioning
      • Stage 4: Occupancy and Operations
      • Stage 5: Continuous Commissioning
    • FIRE
      • Sprinkler Systems
      • Suppression Systems
      • FM-200
    • MECHANICAL
      • Chilled Water
      • Condenser Water
      • Heating Water
      • Ventilation
    • OTHER
      • PRE-FUNCTIONAL CHECK LISTS
      • DATA CENTER
      • LEED
      • ELECTRICAL
      • PLUMBING & DRAINAGE
      • HANDOVER
      • MAINTENANCE
    • Glossary

    Handover

    [123] B-Training Manual Explanation with Template for Construction Projects

    TRAINING MANUAL | for Operational Staff at Handover with Template

    As we know, a building will usually be designed to operate for a lifespan of at least 25 years; to achieve this, the building operations/facility team must operate and maintain it correctly.

    Level 7 - Acceptance - Data Center Commissioning Steps

    LEVEL 7 – DATA CENTER COMMISSIONING | Acceptance

    Level 7, managed by the client CxA, is usually quick to complete; it concludes the overall project commissioning activities with the client/end-user accepting, during a … Read More

    Level 6 Data Center Commissioning Step by Step Guide

    LEVEL 6 – DATA CENTER COMMISSIONING | Closeout & Turnover

    Level 6 of the Data Center Commissioning Process moves the project from the onsite commissioning phase to close out, turn over, and hand over. The … Read More

    As-built Drawings

    AS-BUILT DRAWINGS | What are they?

    Produced in the latter stages of the project by the construction project team, as-built drawings provide the final design and installation information of a project … Read More

    Operating and Maintenance Manuals Examples and Guideline

    O&M MANUALS | Guide, Format, Documents, File, and Template

    Once a facility has been constructed or fitted out, the general/main contractor will have an obligation within the contract and, in some instances, legally, to … Read More

    We are a participant in the Amazon Services LLC Associates Program, an affiliate advertising program designed to provide a means for us to earn commissions by linking to Amazon.com and affiliated sites.

    ABOUT US | PRIVACY POLICY | WEBSITE DISCLAIMER | © 2021 constructandcommission.com

    • DOC SHOP
      • Bundles [SAVINGS]
      • Cx Process [ALL]
      • Checklists [ALL]
      • Data Center [ALL]
      • Testing Procedures [ALL]
      • Fire [ALL]
      • Mechanical [ALL]
      • Maintenance [ALL]
    • CX PROCESS
      • COMMISSIONING PLAN
      • Cx Kick Off Meeting
      • Basis of Design
      • Overview of the Cx Process
      • Stage 1: Pre-Design
      • Stage 2: Design
      • Stage 3a: Pre-Construction explained
      • Stage 3b: Construction
      • Stage 3c: Commissioning
      • Stage 4: Occupancy and Operations
      • Stage 5: Continuous Commissioning
    • FIRE
      • Sprinkler Systems
      • Suppression Systems
      • FM-200
    • MECHANICAL
      • Chilled Water
      • Condenser Water
      • Heating Water
      • Ventilation
    • OTHER
      • PRE-FUNCTIONAL CHECK LISTS
      • DATA CENTER
      • LEED
      • ELECTRICAL
      • PLUMBING & DRAINAGE
      • HANDOVER
      • MAINTENANCE
    • Glossary