CRAC Unit vs CRAH Unit | What’s the difference?
The difference between a CRAC Unit System and a CRAH Unit System is how the heat is transferred and then removed/ejected from the system. A … Read More
The difference between a CRAC Unit System and a CRAH Unit System is how the heat is transferred and then removed/ejected from the system. A … Read More
After the Flushing and Chemical Cleaning steps have been completed, there will usually be a requirement to monitor the water quality for a period of time prior to handover…
Corrosion coupons are installed within a hydraulic system [chilled water/condenser water] to allow the examination of the overall ‘corrosion rate’, allowing the system’s current condition to be understood and the ability to also predict its future life expectancy
FLUSHING & CLEANING PIPEWORK [PDF] Pre-Commissioning Checklist covering; Delivery, Storage, Installation & Pre-Commissioning/Pre-Functional Checks
WATER COOLED CHILLER [PDF] Pre-Commissioning Checklist covering; Delivery, Storage, Installation & Pre-Commissioning/Pre-Functional Checks
Make up water and Blow Down Systems explained, including overview for Cycles of Concentration.
Various piping layouts and diagrams are detailed for the Cooling Towers, including equalizer pipework, make up water, drainage, blowdown, bypass, filtration…
This Cooling Tower Preventative Maintenance Checklist covers the Daily, Monthly, Quarterly, Semi-Annually and Yearly checks and activities + can be DOWNLOADED in PDF…
COOLING TOWERS need to be inspected, cleaned and documented in line with local government requirements to ensure they are not at risk of developing Legionella…
A cooling tower sweeper system is a simple system consisting of a filter, a pump, a range of plastic pipework, and various nozzles that are installed around the perimeter of the basin…
cooling process being ejected from the top of the tower, mixing with cooler ambient air creating a plume of condensation that looks like white smoke.
Cooling towers can consist of up to 38 components, here we have detailed and explained them all…
COOLING TOWER [PDF] Pre-Commissioning Checklist covering; Delivery, Storage, Installation & Pre-Commissioning/Pre-Functional Checks
The types of Cooling Towers and Ponds come in many forms, sizes, and prices, but all have the same purpose, to act as a heat … Read More
Here we go through in detail the steps required to successfully complete the pump and alignment testing, prior to hydrostatic balancing taking place…
CENTRIFUGAL PUMP [PDF] Pre-Commissioning Checklist covering; Delivery, Storage, Installation & Pre-Commissioning/Pre-Functional Checks
Hydraulic Pressure testing, usually completed by using a medium of water, is a documented non-destructive test using pressure to validate a pipework system’s integrity. The testing is usually completed after any installation or modification works.