Enhanced Commissioning

Enhanced Commissioning takes the fundamental process and ‘enhancing it’ under the LEED U.S Green Building Council Pre-Requisite V4 BD+C New Construction, with its aim being to ensure that any systems related to energy, water, indoor environmental quality, and durability, upon handover, have been fully documented proving that they are designed, installed, set up, and operating as per their original design intent.

Enhancements to the fundamental process would be:
- Verification of operator/occupant training and delivery.
- Plan and manage seasonal testing.
- Develop an ongoing commissioning plan.
- Complete a 10 month review.
- Develop a monitoring based commissioning process.
- Envelope commissioning.
« Back to Building Commissioning Glossary Index