Skip to content
constructandcommission.com
    constructandcommission.com
    • DOC SHOP
      • Bundles [SAVINGS]
      • Cx Process [ALL]
      • Checklists [ALL]
      • Data Center [ALL]
      • Testing Procedures [ALL]
      • Fire [ALL]
      • Mechanical [ALL]
      • Maintenance [ALL]
    • CX PROCESS
      • COMMISSIONING PLAN
      • Cx Kick Off Meeting
      • Basis of Design
      • Overview of the Cx Process
      • Stage 1: Pre-Design
      • Stage 2: Design
      • Stage 3a: Pre-Construction explained
      • Stage 3b: Construction
      • Stage 3c: Commissioning
      • Stage 4: Occupancy and Operations
      • Stage 5: Continuous Commissioning
    • FIRE
      • Sprinkler Systems
      • Suppression Systems
      • FM-200
    • MECHANICAL
      • Chilled Water
      • Condenser Water
      • Heating Water
      • Ventilation
    • OTHER
      • PRE-FUNCTIONAL CHECK LISTS
      • DATA CENTER
      • LEED
      • ELECTRICAL
      • PLUMBING & DRAINAGE
      • HANDOVER
      • MAINTENANCE
    • Glossary
    constructandcommission.com
    • DOC SHOP
      • Bundles [SAVINGS]
      • Cx Process [ALL]
      • Checklists [ALL]
      • Data Center [ALL]
      • Testing Procedures [ALL]
      • Fire [ALL]
      • Mechanical [ALL]
      • Maintenance [ALL]
    • CX PROCESS
      • COMMISSIONING PLAN
      • Cx Kick Off Meeting
      • Basis of Design
      • Overview of the Cx Process
      • Stage 1: Pre-Design
      • Stage 2: Design
      • Stage 3a: Pre-Construction explained
      • Stage 3b: Construction
      • Stage 3c: Commissioning
      • Stage 4: Occupancy and Operations
      • Stage 5: Continuous Commissioning
    • FIRE
      • Sprinkler Systems
      • Suppression Systems
      • FM-200
    • MECHANICAL
      • Chilled Water
      • Condenser Water
      • Heating Water
      • Ventilation
    • OTHER
      • PRE-FUNCTIONAL CHECK LISTS
      • DATA CENTER
      • LEED
      • ELECTRICAL
      • PLUMBING & DRAINAGE
      • HANDOVER
      • MAINTENANCE
    • Glossary

    General Maintenance Works

    AHU | Preventative Maintenance Checklist covering Weekly to 3 Years + Download

    To ensure that any air handling unit [AHU] installed is maintained, operates efficiently, and is in line with the current design requirement years after installation, … Read More

    FM200™ SYSTEM | Preventative Maintenance Checklist + Download

    FM-200 system maintenance checklist inspections should be completed at the following intervals: Daily, Monthly, monthly, Yearly,2 Yearly, 5 Yearly…

    Cooling Tower Maintenance Checklist

    COOLING TOWER | Preventative Maintenance Inspections

    This Cooling Tower Preventative Maintenance Checklist covers the Daily, Monthly, Quarterly, Semi-Annually and Yearly checks and activities + can be DOWNLOADED in PDF…

    Inspecting and Cleaning of Cooling Tower

    COOLING TOWER | Inspecting & Cleaning Overview

    COOLING TOWERS need to be inspected, cleaned and documented in line with local government requirements to ensure they are not at risk of developing Legionella…

    How to maintain a fan coil unit

    FAN COIL UNIT | Week, Month, 6 months, Year & 4 Year Inspections Listed

    Listing the Fan Coil Unit maintenance inspections for Weekly, Monthly, 6 Months, 1 Yr and 4 Yrs, that should be conducted

    We are a participant in the Amazon Services LLC Associates Program, an affiliate advertising program designed to provide a means for us to earn commissions by linking to Amazon.com and affiliated sites.

    ABOUT US | PRIVACY POLICY | WEBSITE DISCLAIMER | © 2021 constructandcommission.com

    • DOC SHOP
      • Bundles [SAVINGS]
      • Cx Process [ALL]
      • Checklists [ALL]
      • Data Center [ALL]
      • Testing Procedures [ALL]
      • Fire [ALL]
      • Mechanical [ALL]
      • Maintenance [ALL]
    • CX PROCESS
      • COMMISSIONING PLAN
      • Cx Kick Off Meeting
      • Basis of Design
      • Overview of the Cx Process
      • Stage 1: Pre-Design
      • Stage 2: Design
      • Stage 3a: Pre-Construction explained
      • Stage 3b: Construction
      • Stage 3c: Commissioning
      • Stage 4: Occupancy and Operations
      • Stage 5: Continuous Commissioning
    • FIRE
      • Sprinkler Systems
      • Suppression Systems
      • FM-200
    • MECHANICAL
      • Chilled Water
      • Condenser Water
      • Heating Water
      • Ventilation
    • OTHER
      • PRE-FUNCTIONAL CHECK LISTS
      • DATA CENTER
      • LEED
      • ELECTRICAL
      • PLUMBING & DRAINAGE
      • HANDOVER
      • MAINTENANCE
    • Glossary