Skip to content
constructandcommission.com
    constructandcommission.com
    • DOC SHOP
      • Bundles [SAVINGS]
      • Cx Process [ALL]
      • Checklists [ALL]
      • Data Center [ALL]
      • Testing Procedures [ALL]
      • Fire [ALL]
      • Mechanical [ALL]
      • Maintenance [ALL]
    • CX PROCESS
      • COMMISSIONING PLAN
      • Cx Kick Off Meeting
      • Basis of Design
      • Overview of the Cx Process
      • Stage 1: Pre-Design
      • Stage 2: Design
      • Stage 3a: Pre-Construction explained
      • Stage 3b: Construction
      • Stage 3c: Commissioning
      • Stage 4: Occupancy and Operations
      • Stage 5: Continuous Commissioning
    • FIRE
      • Sprinkler Systems
      • Suppression Systems
      • FM-200
    • MECHANICAL
      • Chilled Water
      • Condenser Water
      • Heating Water
      • Ventilation
    • OTHER
      • PRE-FUNCTIONAL CHECK LISTS
      • DATA CENTER
      • LEED
      • ELECTRICAL
      • PLUMBING & DRAINAGE
      • HANDOVER
      • MAINTENANCE
    • Glossary
    constructandcommission.com
    • DOC SHOP
      • Bundles [SAVINGS]
      • Cx Process [ALL]
      • Checklists [ALL]
      • Data Center [ALL]
      • Testing Procedures [ALL]
      • Fire [ALL]
      • Mechanical [ALL]
      • Maintenance [ALL]
    • CX PROCESS
      • COMMISSIONING PLAN
      • Cx Kick Off Meeting
      • Basis of Design
      • Overview of the Cx Process
      • Stage 1: Pre-Design
      • Stage 2: Design
      • Stage 3a: Pre-Construction explained
      • Stage 3b: Construction
      • Stage 3c: Commissioning
      • Stage 4: Occupancy and Operations
      • Stage 5: Continuous Commissioning
    • FIRE
      • Sprinkler Systems
      • Suppression Systems
      • FM-200
    • MECHANICAL
      • Chilled Water
      • Condenser Water
      • Heating Water
      • Ventilation
    • OTHER
      • PRE-FUNCTIONAL CHECK LISTS
      • DATA CENTER
      • LEED
      • ELECTRICAL
      • PLUMBING & DRAINAGE
      • HANDOVER
      • MAINTENANCE
    • Glossary

    Fire/Life Safety System [FS]

    Gas Suppression Functional Testing Method

    GASEOUS/FM200 SYSTEM | Functional Testing Template & Download

    Upon completion of any new Gaseous / Clean Agent System installation or modifications to an existing system, there will be a requirement to complete a … Read More

    FM200 System Pre-Functional Checklist

    GAS SUPPRESSION / FM 200 SYSTEM | Pre-Functional Checklist

    This FM 200 / Gas Suppression Pre-Functional Test Checklist can be used and completed throughout the project and its different stages covering: delivery, storage, installation … Read More

    [090] How does a FM200 System Work

    FM200 SYSTEM | How does it Work?

    The most common type of FM200 System seen is a total flooding, automatically operated one using zoned smoke heads, installed at a high level and … Read More

    [084] Room-Integrity-Requirements-Front

    CLEAN AGENT | Room Integrity Testing Requirements

    When installing a fixed firefighting gas extinguishing system, under NFPA 2001 and BS EN 15004-1, there is a requirement to complete a Room Integrity/Enclosure Test. … Read More

    [088] What are Clean Agents

    CLEAN AGENTS | What are they, Types & Benefits

    The best definition for a Clean Agent is by NFPA 2001. It describes it as “a volatile or gaseous fire extinguishant that is electrically nonconducting … Read More

    4 Types of Sprinkler Systems

    FIRE SPRINKLER SYSTEMS | 4 Types Explained

    The NFPA notes that there are 4 types of Fire Sprinkler Systems | 1. Wet, 2. Dry, 3. Pre-Action, 4. Deluge Systems…

    We are a participant in the Amazon Services LLC Associates Program, an affiliate advertising program designed to provide a means for us to earn commissions by linking to Amazon.com and affiliated sites.

    ABOUT US | PRIVACY POLICY | WEBSITE DISCLAIMER | © 2021 constructandcommission.com

    • DOC SHOP
      • Bundles [SAVINGS]
      • Cx Process [ALL]
      • Checklists [ALL]
      • Data Center [ALL]
      • Testing Procedures [ALL]
      • Fire [ALL]
      • Mechanical [ALL]
      • Maintenance [ALL]
    • CX PROCESS
      • COMMISSIONING PLAN
      • Cx Kick Off Meeting
      • Basis of Design
      • Overview of the Cx Process
      • Stage 1: Pre-Design
      • Stage 2: Design
      • Stage 3a: Pre-Construction explained
      • Stage 3b: Construction
      • Stage 3c: Commissioning
      • Stage 4: Occupancy and Operations
      • Stage 5: Continuous Commissioning
    • FIRE
      • Sprinkler Systems
      • Suppression Systems
      • FM-200
    • MECHANICAL
      • Chilled Water
      • Condenser Water
      • Heating Water
      • Ventilation
    • OTHER
      • PRE-FUNCTIONAL CHECK LISTS
      • DATA CENTER
      • LEED
      • ELECTRICAL
      • PLUMBING & DRAINAGE
      • HANDOVER
      • MAINTENANCE
    • Glossary